Korelin Economics Report

Heliostar Metals – A dive into the initial drill results from the Unga Project yielding 88.3g/t gold over 3 meters

Yesterday Heliostar Metals (TSX.V:HSTR – OTCQX:HSTXF) announced the first set of drill results from the Apollo Prospect on the Unga Project, in Alaska. From the 4 holes released the headline numbers were 88.3 g/t Gold over 3.05 metres and 19.3 g/t Gold over 4.57 metres.

Charles Funk, President and CEO of Heliostart Metals joins us to discuss these results. We start by outlining the location of the drill holes which have now shown mineralization over 725 metres, and is open in all directions. We also look ahead to the other 23 holes at the Apollo Prospect still at the assay lab as well as the other targets that are being drilled in the ongoing exploration program.

If you have any follow up questions for Charles please email us at Fleck@kereport.com or Shad@kereport.com.

http://www.kereport.com/wp-content/uploads/2021-06-17-Charles-Funk-Heliostar-Metals.mp3

Click here to read over the full news release highlighting the drill results.

Exit mobile version