Minimize

Welcome!

Allegiant Gold – Follow up on the best hole ever drilled at the Eastside Project, yielding 148meter of 2.6g/t gold

Cory
August 11, 2021

Peter Gianulis, President and CEO of Allegiant Gold (TSX.V:AUAU – OTCQB:AUXXF) joins us to recap the news released on May 26th reporting the best drill result ever on the Eastside Project, in Nevada. Hole 243 intersected 2.6g/t gold over 148 meters and hole 239 intersected 39g/t gold over 3 meters. We discuss the location of these holes and the importance of the high grade intercepts when it comes to a possible mining scenario for the Project.

We then discuss the Resource Estimate that was released on August 4th that reported a 1.4million oz gold deposit plus 8.7million oz silver. Looking head we have Peter outline the follow up drill plans that include a mix of diamond and RC drilling to continue to expand the resource.

Please email us with any follow up questions for Peter regarding the work ongoing at Allegiant. Our email addresses are Fleck@kereport.com or Shad@kereport.com.

Click here for a summary of the recent news out of the Company.