Minimize

Welcome!

Goldshore Resources – Initial Holes of the 100,000 meter Program hits Widespread Gold Mineralization at Moss Lake Gold Project

Cory
November 1, 2021

Brett Richards, President and CEO of Goldshore Resources (TSX.V:GSHR – OTCQB:GSHRF) joins us to recap the initial drill results from the Moss Lake Gold Project in Ontario. The first 3 holes of the 100,000 meter program were released each hitting gold mineralization over long widths, including 57meters at 1.2g/t gold, 36meters at 1.15g/t gold, and 31meters at 1.09g/t gold.

 

We have Brett explain the strategy of these holes that were all drilled outside/below the 2013 historic resource model. Some of the key notes are; “Mineralization was intersected between 100 and 500 m below the 2013 historical resource model in MMD-21-002 which represents a +100% increase to the known vertical extent of the gold zones in this area” and “Mineralization was intersected over 550 m in MMD-21-001 which corresponds to an estimated true thickness of 422 m which is a 52% increase over the 2013 historical resource model in that area”.

 

Please email us with any follow up questions for Brett. Out email addresses are Fleck@kereprot.com and Shad@kereport.com.

 

 

 

Click here to read over the new release highlighting the drill results we discussed.