Minimize

Welcome!

AbraSilver Resource – A New Copper Discovery On The First 2 Holes At La Coipita and An Exploration Update From Diablillos

Cory
June 30, 2022

John Miniotis, President and CEO of AbraSilver Resource (TSX.V:ABRA – OTC:ABBRF) and David O’Conner, Chief Geologist joins us for an exploration update from both the flagship Diablillos Project and newly drilled La Coipita Project, both in Argentina.

 

Starting with La Coipita, the Company reported the first 2 drill holes that yielded long widths (up to 226 meters) of copper mineralization. We have John and Dave outline the history of the project and recap the initial results.

 

We then move to the Diablillos Project by recapping the recently completed 20,000 meter drill program and the 15,000 meter program that is underway. There is a resource update coming soon and a Pre-Feasibility Study planned for after the resource.

 

If you have any follow up questions please email us at Fleck@kereport.com and Shad@kereport.com.

 

 

 

Click here to visit the AbraSilver Resources website and read over the recent news.