Minimize

Welcome!

Norsemont Mining – Growth Strategy AT The Choquelimpie Gold-Silver-Copper Project in Chile: Exploration and Potential Near Term Production

Cory
August 18, 2025

 

In this company introduction, I welcome Marc Levy, Chairman & CEO of Northmont Mining, for a first in-depth discussion on the company’s flagship Choquelimpie Gold-Silver-Copper Project in Chile.

 

Northmont is advancing a past-producing mine with existing infrastructure, including a mill, power, water, and extensive historic drilling. The project already hosts over 2.7Moz gold equivalent in resources (2.18Moz Indicated + 557koz inferred), with immediate potential to expand.

 

Key discussion points:

 

  • Financing & Strategic Investors – Recent oversubscribed financing, including participation from Rob McEwen and other notable industry names.

  • Three-Phase Growth Plan – Advancing stockpile production, expanding the high-grade oxide resource, and testing a large copper porphyry target.

  • Drill Program Launch – $3.5M allocated to near-term drilling: shallow oxide holes, deeper step-outs on high-grade zones, and initial porphyry testing.

  • Timeline to Production – Pathway to restart operations within ~2 years, supported by existing infrastructure and ongoing permitting.

  • Team Strength – Backed by a proven leadership group with multiple successful mining exits and Chilean mine-build experience.

Near-term catalysts include final financing close, drill program commencement, and steady news flow from exploration, metallurgy, and engineering.

 

Follow up questions for Marc? Email me at Fleck@kereport.com

Click here to visit the Norsemont Mining website.

Leave a Reply

Your email address will not be published. Required fields are marked *