BP Silver – 5 Meters of 600 g/t Silver, Including 1 Meter of 1655 g/t Silver Intersected In Phase 1 Drill Program At The Cosuño Silver Project
Tim Shearcroft, CEO of BP Silver Corp. (TSXV: BPAG), reviews some bonanza-grade assays in the final eight drill holes of its eleven-hole Phase I drill program at the Cosuño Silver Project in Bolivia. We discuss the follow up geophysics survey and goals of the Phase II exploration program.
BP Silver – First 2 Drill Holes Returned From The Phase I Program At The Cosuño Silver Project In Bolivia
Tim Shearcroft, CEO and Co-Founder of BP Silver Corp. (TSXV: BPAG), reviews the first two drill holes from its eleven-hole Phase I drill program at the Cosuño Silver Project, located in the prolific Bolivian silver belt.
BP Silver – An Emerging Silver and Polymetallic Exploration Company Drilling The Cosuño Silver Project In Bolivia
Tim Shearcroft, CEO of BP Silver Corp. (TSXV: BPAG), provides a comprehensive introduction to this newly listed silver and polymetallic exploration company focused on exploration of their flagship Cosuño Project in Bolivia. Additionally, they are finalizing the title at their Titiri Project, located in a major under-explored silver belt with Tier 1 discovery potential.