Minimize

Welcome!

Blackrock Silver – Highest-Grade Silver And Gold Intercept To Date Reported At The Tonopah West Project

Shad Marquitz
October 18, 2022

Andrew Pollard, CEO of Blackrock Silver (TSX.V: BRC – OTCQX: BKRRF), joins us to discuss recent drill results from the Company’s ongoing step-out and in-fill drilling programs on its 100% controlled Tonopah West project located along the Walker Lane trend in west-central Nevada.

 

Drill hole# TXC22-057 has delivered the highest-grade intercept at the project to date, intersecting 0.91 metres of 37.86 g/t Au and 2,740 g/t Ag or 6,526.7 g/t AgEq within 1.52 metres grading 22.88 g/t Au and 1,654.1 g/t Ag or 3,942.2 g/t AgEq starting at 191.42 metres down-hole in the “New Discovery” area along the southern edge of the DPB resource area. We also discussed how this new zone of mineralization is to the south, expanding the mineralized footprint well beyond the April 2022 resource boundary and shows this project remains open to the south, northwest, and at depth.

 

Other drill results released also demonstrate continued expansion of the key known mineralized structure on the project at the Denver/Victor vein by an additional 600 metres to the Northwest, which has now grown to over 3 kms of drill-defined strike, and appears to remain open to the west.  There are 2 drill rigs operating at site and assays for 10 drill holes are pending at this time, with additional holes already planned and highlighted on the accompanying graphic below.  We also discuss this future drilling and how that will tie into an eventual updated mineral resource estimate.

 
If you have any follow up questions for Andrew on Blackrock Silver, then please email us at Fleck@kereport.com or Shad@kereport.com

 

 

Click here to visit the Blackrock Silver website and read over the recent news releases.