Minimize

Welcome!

LithiumBank – Boardwalk Hydrogeological Results, PEA Timeline and the latest from Park Place

Cory
October 18, 2022

Rob Shewchuck, Chairman and CEO of LithiumBank (TSX.V:LBNK) joins me to recap the October 13th news released announcing the results of a hydrogeological study and well network design at the Boardwalk Lithium Brine Project, located in west-central Albert.

 

The key to this study is how it will filter into the upcoming PEA on the Project. We discuss the key data within the results, including the flow rates, production rates and years of production.  I also have Rob provide us with a general comparison of where he sees this Boardwalk Lithium Brine Project positioned compared to other lithium brine projects in the market. It’s still a small and emerging sector. 

 

We also get an update on the Park Place Lithium Brine Project (was renamed from Fox Creek) located in west-central Alberta. The Company just commenced (announced on September 22nd) a hydrogeological study at this asset. Rob provides more of an introduction to this asset and the work planned here.

 

If you have any follow up questions for Rob please email me at Fleck@kereport.com.

 

 

 

Click here to visit the LithiumBank website and read over the recent news releases we discussed.

Discussion
1 Comment
    Oct 18, 2022 18:33 AM

    Freegold intersects 155.5 m of 2.57G/T AU, I would say that is a pretty good drill hole, at Golden Summit.

    https://money.tmx.com/en/quote/FVL/news/5280966502076303/FREEGOLD_INTERSECTS_1555M_GRADING_257_GT_AU_INCLUDING_731_M_GRADING_426_GT_AU_AT_GOLDEN_SUMMIT